Another coordination problem — and how I solved it, tank after tank.
01 · Objective
Build API 650 storage tanks the operator can sign off — every time and ASME pressure vessels.
Execution support for API 650 storage tank construction projects (5,000–200,000 barrels) for major Oil & Gas clients, ensuring compliance with API, ASME and project technical standards from fabrication through field execution.
EcopetrolPacific RubialesMansarovar
02 · How it started
More storage. Same standard. Full traceability.
Demand
Major operators needed additional storage capacity built fast.
Bar
Every weld, every plate, traceable to API and ASME.
Reality
Multiple concurrent tank builds across sites and clients.
Plan
Standardize ITPs and inspection cadence across the program.
03 · Scope & deliverables
Inspection-ready assets — engineering to handover.
ITPsInspection reportsNDT records (PT/MT)Non-conformity logPer-tank dossier
04 · Team & my role
Project Engineer / QA/QC — anchored to the standard.
Coordinated inspection and testing activities, developed and implemented ITPs, and collaborated with engineering and construction teams across multiple concurrent tank builds.
05 · Process
Repeatable rigor across every tank in the program.
01
Develop and implement Inspection & Test Plans (ITPs) and technical procedures aligned with API 650 and ASME.
02
Coordinate inspection and testing activities — PT, MT, VT, UT, RT — across fabrication and field.
03
Monitor progress and identify non-conformities tank by tank.
04
Implement corrective actions to maintain schedule and quality performance.
05
Close out per-tank dossiers and hand over inspection-ready assets.
06 · Decision-making
Anchor every call to API/ASME and traceability.
Signal
Field inspections and NDT records flagged deviations early in the build.
Action
Triggered corrective actions before non-conformities became rework.
Trade-off
Held the line on standard compliance even under schedule pressure.
Outcome
Predictable handover to operations — tank after tank.
07 · Results & impact
A program of inspection-ready storage assets.
5K–200K bbl
Per-tank capacity range
API650 /ASME
Construction standard
0
Major operators served
Delivered compliant, inspection-ready storage assets for Ecopetrol, Pacific Rubiales and Mansarovar, maintaining alignment between engineering, construction and quality across the program.